• Client: HB Villages
  • Location: Leeds
  • Project Length: 5 months

HB Villages Leeds


Warning: count(): Parameter must be an array or an object that implements Countable in /home2/iphelectrical/K8SYPKM4/htdocs/wp-content/plugins/user-specific-content/User-Specific-Content.php on line 373

On this site we fulfilled a full electrical installation of lighting and power, which included Mains boards, sub-boards, underfloor heating and lightning protection.

At this assisted living facility we completed the enabling on a 3 block 32 room, 9 apartment scheme, allowing a better more independent living arrangement for people with extra needs.

We completed a full design, supply and install service of an L1 addressable fire alarm linked to Automatic Opening Vents. With an automatic Net2 Paxton based door entry system and various internal doors to suit the needs of the client. Neptis automatic door openers.

Included in the build was the design and installation of a full Tynetec Warden Call System including distress pull cords, handsets, door opener alerts and safety pendants.

A fully integrated Genie HD IP CCTV system was installed.

All rooms, offices and communal areas are fully networked via the communications cupboard.

Rooms that cater for people with physical needs have specialised adaptive Mode lighting and Udrains.